- System Design and design criteria covering the Power requirement, Power supply, Power distribution, plant earthling, lightning protection for the buildings.
- Preparation of detailed drawings for the plant illumination including the lux levels
- Fault level calculations and relay coordination/settings.
- Technical support required submitting the application to the state electricity board for the power supply system/requirement.
- Preparation of detailed specification and tender document and assistance for the evaluation of the bids received for the procurement of the following equipment.
- Main receiving station including power transformers
- Distribution transformers
- HT and LT Switchboards
- Motor Control Centers
- Under ground and over head cables covering HT & LT cables
- Control Cables
- Lightning protection equipment
- Power Factor Improvement Equipment
- HT and LT Motors, Thyristorised DC variable speed motors and associated control panels and drives
- 110V Battery and Battery Chargers
- AC Variable Drive
- HT & LT Capacitor
- Field mounting electrical equipment.
- Plant Illumination and lighting.
- Plant Earthing
- Preparation of tender documents giving the specifications, General conditions of contract, special conditions of contract-etc and invite the bidders for finalizing the errection contractor.
- Evaluate the bids received and prepare the comparative statement and assist M/s orient cement to select the contractor.
- Participation in the meetings with the customer, equipment suppliers, and any other agencies involved in the project.
- Review and Scrutinize the GA drawings, power and control schematics and design details for the equipment and to check conformity with technical specifications.
- Review and scrutinize the layout and electrical engineering drawings showing general arrangement and fixing details for the following drawings.
- Indoor/outdoor receiving stations
- Preparation of single line diagrams
- Main pant Sub-station
- Load centers
- Motor control stations
- Thyristor converter rooms
- Main cable tunnels and Cable trenches
- Cable routing details and clamp terminal diagrams
- Cable scheduling/cable termination details
- Field mounted electrical equipment
- System and equipment earthling
- Lightning protection of plant structures
- Review and scrutinize the drawings for the submission to Electrical Inspectorate for substations.
- Review and scrutinize the as built drawings incorporating the site instructions and submission of the same in soft copy.
|
|
|